Meta Pixel

News and Announcements

Long Pipes CEO Interview

  • Published December 17, 2013 3:50AM UTC
  • Publisher Wholesale Investor
  • Categories Executive Interviews

Long Pipes has developed the Fluid HighwayTM. This is a light, efficient and durable, impermeable, (does not leak gas), pipeline technology that is manufactured at a rapid rate in the field with no joints or welds required. The composite pipe is strong, flexible and able to withstand extreme temperature variations and high pressure.

For over 100 years, industry has been using steel pipelines as their primary pipeline solution and this is considered the incumbent technology. Industry and government has been looking for a continuous (no joints), fully thermoplastic, lined, non-metallic pipeline that can be manufactured on site, in or beside the trench and yet attain high operating pressures of +100 Bar.

The Fluid HighwayTM is a demonstrated, cost-effective technology that has the potential to challenge the global steel, high density polyethylene and fibreglass pipeline industries and become the material of choice for oil, gas, water slurry and hydro transportation networks.

The Long Pipes Offer closes Wednesday, December 18

Company Updates
The A$20.4 Million Inertia Trap: How Kepa Software Is Unlocking Value in Enterprise Capital Allocation

A government agency renewed the same maintenance decision nine years running, because auditing the original choice was deemed too expensive. When the portfolio was finally tested, A$20.4 million of low value spend was identified in a single year. Kepa Software’s capital governance platform was built to expose and eliminate precisely these boardroom blind spots. For […]

Company Updates
The prefab company that deliberately leaves part of the house unbuilt

BuiltQuik prefabricates the floor and roof structure and stops there. Co-founder Ryan Mullaney argues the omission is the product. Prefabricated housing usually means a factory. A large central facility, identical modules, limited room to move on design, and a logistics problem getting the finished box to site. BuiltQuik builds the opposite, and the design decision […]

Join over 45,000+ sophisticated investors

Join Now